Twilight Crest
Arcaded curves and a central art sculpture anchor the elevation; layered lighting and materials create gallery-like ceremony with a discreet basement entry.
Project Overview
Project Name
Dusk Gallery House
Client Background
A collector couple envisioned an elegant residence with gallery-like presence and ceremonial arrival.
Objective
Craft a sculptural frontage with layered night lighting and a discreet basement approach.
Scope
Formal entry axis with arcaded curves and central art plinth
Large glazing to living spaces; private bedroom wings
Basement garaging and screened service areas
Key Details
Location: Upper North Shore
Levels: 2 above grade + basement
Special Features: Feature sculpture, ceremonial lighting, concealed driveway